Expert service · Environmental Product Declaration · EPD

A tender asks for an EPD.

The EPD reports your product's environmental figures, calculated by a life cycle assessment, or LCA. Our team prepares it to ISO 14025, the international standard for EPDs. For construction products it is also prepared to EN 15804+A2, the European rules for their EPDs.

  • ISO 14025 and EN 15804+A2
  • Verifier independent of EuFSI
  • Based in Enschede, the Netherlands

An example Environmental Product Declaration for a tender, prepared to EN 15804+A2 and ISO 14025, for a declared unit of one square metre. Modules A1 to A3, C1 to C4 and D are declared, and A4, A5 and B1 to B7 are not. GWP-total by declared module is 186 kilograms of CO2 equivalent for A1 to A3, 28 for C1 to C4 and minus 21 for D. The results read GWP-total 214 kilograms of CO2 equivalent, fossil resource use 2,310 megajoules and net fresh water 1.9 cubic metres. The verifier is independent of EuFSI. All figures are examples.

Programme and check

The EPD states its programme and end date

The programme and its calculation rules, called product category rules, are agreed with you for your tender first.

The tender's request names a programme or database. The EPD prints its programme and its end date, normally five years after publication. In this example the programme is an ISO 14025 programme and the EPD is valid until 11 March 2031.

Examples

  • EPD International

    Programme

    Independent checker
    An approved verifier or an accredited certification body
    Published in
    Its EPD library
  • IBU

    ProgrammeInstitut Bauen und Umwelt

    Independent checker
    A verifier IBU assigns
    Published in
    IBU's EPD list and ÖKOBAUDAT, Germany's building database
  • NMD

    DatabaseNationale Milieudatabase

    Independent checker
    An LCA-toetser the NMD recognises
    Published in
    The NMD, for the legal environmental performance calculation of Dutch buildings

Our team gives each checker the EPD and its project report and answers its questions until the check is complete.

What you receive

The LCA project report goes with your EPD

Two documents side by side. A construction product's EPD is published by the programme operator. The LCA project report is read by the checker with it. Beside them is the registration application or the declaration for the NMD.

Support for the registrationWith the programme or the NMD
What an EN 15804+A2 EPD states

A construction product's EPD states the items below.

  1. The programme operator, the product category rules used and the registration number.
  2. The unit the figures describe, such as one tonne or one square metre.
  3. The life-cycle stages declared, and the assumptions for each.
  4. The environmental indicators the product category rules set. Climate change is reported as a total and as three separate figures. These are fossil, biogenic, and land use and land-use change.
  5. Resource use and waste.
  6. The verification statement, the date of publication and the end date.
Stages in a construction product's EPD
StageWhat it coversIn the EPD
A1 to A3Raw materials, transport to your plant and manufacturingRequired
A4 and A5Transport to the building site and installationOptional
B1 to B7The product in use, its upkeep and the energy and water it usesOptional
C1 to C4Demolition, transport, waste processing and disposalRequired
DBenefits and loads beyond the product's life, shown as reuse, recovery and recycling potentialRequired

Set by EN 15804+A2, which allows narrow exceptions.

Data we ask for once

The data request asks mostly for your records

We ask for this once. Our team reuses it if you order other outputs.

If a supplier gives no figure, our team uses an average from a published database. The project report marks it as an estimate.

Only the EuFSI team works on your files. They are used only for the work you order.

EuFSI

One data request

  • Bill of materialsProduct development
  • Energy and fuelFinance, site manager
  • Supplier repliesPurchasing
  • Sites and productionProduction manager
  • Transport legsLogistics
  • Water use and waste per siteSite manager
  • Supplier EPDs you holdPurchasing

How it runs

Six steps from the call to publication

  1. Call and quote

    You and our team

    Your tender and products, then a written quote

  2. Programme and rules

    You and our team

    Agreed before the data request

  3. Data request

    Our team, then you

    From your records and your suppliers' replies

  4. LCA and drafts

    Our team

    The EPD and its project report

  5. Check

    Independent checker

    A verifier or LCA-toetser independent of EuFSI

  6. Publication

    Programme or NMD

    Publishes the EPD or the NMD declaration

The timeline depends on complete records, your suppliers' replies and the checker's calendar.

Your sites can be inside or outside the EU.

Questions

Do we receive a certificate?

No. You receive an EPD, a declaration prepared to ISO 14025, with its LCA project report. A checker the programme accepts, independent of EuFSI, checks both.

The published EPD carries the checker's verification statement, and the EPD's registration number and end date. Our team gives the checker both documents and answers its questions until the check is complete.

What if our tender names the NMD?

A declaration for the NMD is calculated to the Bepalingsmethode, the Dutch calculation method. An LCA-toetser the NMD recognises checks it before it enters the NMD.

An EPD made for another country must meet the same method first. The data behind it can often be reused. Our team can prepare the declaration, or adapt an EPD you already hold.

Can several similar products share the work?

Yes, if the product category rules allow it. A family of similar products can then share one project report.

For a site that makes several products, its energy totals are a usual starting point. The rules set how that energy is divided over your products.

What if no product category rules exist for our product?

Some programmes, such as IBU, help write rules for a product group that has none. The EPD is then calculated to them. Writing the rules adds a step before the LCA starts.

What happens at our EPD's end date?

Your EPD can be renewed at its end date, with an update and a new check.

Some programmes, such as EPD International, require an update sooner. That applies after errors, substantial changes to the product information or a result that rises beyond a set limit. Our team can prepare the update.

Does the new Construction Products Regulation require an EPD?

No. The new EU Construction Products Regulation does not require one. It adds climate change figures to the declaration of performance and conformity. For each product family, the figures are due once its new EU technical rules apply.

Tenders and professional buyers ask for EPDs.

A quote starts from the request you received

Tell us which programme, database or standard the tender names, and its closing date.

LCADPPEPDGHGCSRD · VSMECBAM